fgme shape 02
fgme shape bg 04

Implementation of an installation for preparing aluminum caps

Groupe Sirmet

Détails

Client

SIRMET

Date

2021

Throughput

Implementation time

8 months

Aluminum Cap Recycling with Eddy Current & Milling

FGME participated in the design of this installation comprising an eddy current separator and a flail mill to enable the granulation and pelletizing of the aluminum present in the caps. The separated aluminum caps are smashed in the mill for the separation of remaining attached glass in the caps. The grinded aluminum is than processed in a specific line for downsizing the metal to a proper dimension and shape.

fgme shape bg 03
fgme shape bg 03