fgme shape bg 04

ECOTRANSFORMATION

High-Efficiency 30T/H Wood Recycling Plant with Automation

fgme shape 02

Détails

Client

ECOTRANSFORMATION

Date

March 2025

Throughput

30T/H

Implementation time

12 months

wood recycling plant

FGME developed it as a turnkey project to separate metals and papers/plastics from a pre-crushed recycling wood stream. The wood is recycled wood coming from container parks and wood residue from wood panels industries. The final product is used as well as for thermal valorization and for building of new MDF panels. The technologies installed made it possible to reduce by 40% the electrical consumption of the plant. The entire line is fully automatized.

fgme shape bg 03
fgme shape bg 03